Primavera

Back Up Next

Home
Up
Unit P1
Unit P2
Unit P3
Unit P4
Unit P5
Unit P6

The following links to Primavera Project Planner include the assignment descriptions, but not the tutorial themselves. I have a good reason for not including the tutorials. Such material is very difficult to develop, and I should copyright it before publishing it on the Web. So if you need the tutorial, please ask me for a hard copy.

I have included, as an exception, the tutorial for Lab 3.

The P3 assignments are:

Unit P1
P1.1 Inputting and scheduling a CPM network.
Unit P2
P2.1 Layout formatting.
Unit P3
P3.1 Resource loading.
P3.2 Displaying resource information
P3.3 Resource leveling.
Unit P4
P4.1 Cost loading.
P4.2 Cash flow.
P4.3 Using standard reports.
Unit P5
P5.1 Defining a target schedule.
P5.2 Updating the schedule.
Unit P6
P6.1 As-built schedule.

 

mtcm2.gif (3927 bytes)